Those tasked with a job function related to in-line inspection - from working for an in-line inspection (ILI) service provider to analyzing the ILI results to evaluating ILI-identified pipeline defects “in the field” - may be intimately familiar with the guidance document API 1163 In-line Inspection Systems Qualification published by the American Petroleum Institute. You may also be familiar with the challenges of interpreting AND implementing said document!
To that end, the Pipeline Research Council International (PRCI) published guidelines to provide clarity on how to correctly implement API 1163 and even created a handy spreadsheet tool to assist with validating ILI performance. Much of the guidance document provides clarity on how to perform and calculate a Level 1, 2 or 3 analysis and when each level is applicable.
As it’s OneBridge’s mission to assist pipeline operators in preventing pipeline failures by utilizing their assessment data better, incorporating the PRCI guidelines and calculations contained within the spreadsheet was a no-brainer. Indeed, the OneBridge team worked with a user group to discuss their needs for conducting an API 1163 validation within CIM and the associated workflow.
In CIM’s upcoming release, users will be able to perform a Level 2 and Level 3 validation per API 1163 and PRCI’s project IM-1-06 and associated report entitled “API 1163 Performance Validation Guidelines” published on March 17, 2023 and re-released on May 08, 2023. In a future update, users will be able to perform a Level 1 “similar pipelines” analysis i.e. comparing ILI to ILI data on different but similar pipelines.
If you’ve ever heard the term probability of detection (POD) or seen +/- 10%, 80% in an ILI report, you can thank API 1163. Indeed, this (90 page!) guidance document not only describes how pipeline operators can confirm the quality of ILI systems but maybe more importantly, delineates how ILI service providers should qualify and communicate the performance of their technologies, which is especially important for new technologies. Let’s discuss in detail some of the more interesting aspects of this important guidance document.
In Section 6 Qualification of Performance Specifications, it’s explained that the performance specification of an ILI system should clearly state the type of anomalies, components and characteristics that are to be detected, identified, and sized by the ILI system in industry-standard terms. As you may have guessed, the ILI system will have different detection capabilities for different feature types. Figure 1 graphically shows how metal loss indications can be classified.
Probability of detection (POD): Qualifies the probability that an anomaly will be detected. A detection threshold and POD must be stated for each anomaly type.
Figure 1: Dimensional classes for metal loss indications, Figure 3 in API 1163
Probability of identification (POI): the probability that an anomaly, component or characteristic is correctly identified, stated with a detection threshold and POI.
Figure 2: Characterizing Cracking Probabilities of Identification, Table 3 from API 1163
Sizing Accuracy: characterizes how close the reported dimensions will agree with the true dimensions. This is described with a stated tolerance (e.g. +/- 10%t) and a certainty (e.g. 80% of the time). A sizing accuracy is typically reported for depth, length and width of an anomaly.
API 1163 - 3 Levels of Validation
The higher the level, the more rigorous the validation.
Fun* Facts
API 1163
*Fun is used loosely.
As mentioned previously, the OneBridge team has collaborated with a user group to implement both API 1163 and PRCI’s guidance document into CIM, so that validating your ILI data can be completed within minutes. Conducting an API 1163 analysis is accessed via the Integrity Compliance process within CIM, similar to how a user would analyze ILI data to identify repair conditions. The “Data” tab of the PRCI spreadsheet tool, seen in Figure 3 below, was recreated within CIM and all data fields mapped accordingly. The outputs found on the “Calculations” tab are then calculated to create the applicable unity plots with an example graph seen in Figure 4 below.
Figure 3: Screenshot of the row headings contained on the “Data” tab of the PRCI spreadsheet tool.
Figure 4: Example of an output generated from an API 1163 Level 2 analysis completed in CIM.
Figure 5: Example of an output generated from an API 1163 Level 3 analysis completed in CIM.
Stay tuned for more API 1163 analysis updates within CIM - coming soon!
Comments or questions? We’d love to hear from you!